Edge Olympic | Amsterdam

EDGE Olympic

High standards were set in the areas of sustainability, well-being and circularity, including incorporating façade components into the new floors and constructing the superstructure in wood. All these ambitions resulted in the following certifications:

• BREEAM 4 start
• Energy label A
• WELL Platinum (Core & Shell) – as the first building in the world
• Madaster registration

HC Groep companies made a significant contribution to this project.

HC KP installed the climate ceilings, both climate ceiling islands and closed climate ceilings.

HC RT supplied, installed and integrated all room controls, control technology, Cloud BMS, Smart Building infrastructure and technology and Cyber Security solutions.

Barcol-Air supplied all VAV units, balance controls, air and fire dampers and diffusers.

HC PS designed, installed and certified the car park ventilation system.