The Flow | Amsterdam

The Flow in Amsterdam has an special appearance, distinguished by a powerful design with unusual lines. It is the first Dutch building to achieve the Well core v2 Platinum certificate. The Flow has also achieved the BREEAM 4 star certificate with a BREEAM score of 75,31%.

The Flow | Amsterdam

Architect:
MVSA Architects
Counselor:
Valstar Simonis
Contractor:
G&S Bouw
Installer:
Bosman Bedrijven

HC KP, part of HC Groep, actively contributed to the design phase of the various climate ceiling solutions used in the project. The result is an expressive design, which focuses on an optimal indoor climate and a flexible layout of the building.

In the context of flexibility, it was decided to use grid profiles at a few positions so that, in the future, it will be very easy to install walls under the climate ceiling. These grid profiles are set back a few centimetres from the underside of the ceiling panels.

A narrow joint was created between the ceiling panels. On one hand an architectural choice, on the other hand the intent for hanging pendant luminaires under the climate ceiling. Since these pendant luminaires also illuminate the climate ceiling, the joint is made of the same material as the ceiling panels,so that the entire ceiling is closed. The steel joint is on the same level as the grid profile.

The climate ceiling is powder-coated in the gray RAL colour 7037 and equipped with ClimaPe activation for heating and cooling the room. To supply fresh air into the ceilings, hidden supply grilles are used which are concealed in the ceiling tiles. The draught-free air is blown in the indoor area.

triodos2

Triodos Bank | Driebergen - Rijsenburg

The new headquarters of Tridios Bank is situated near Driebergen. The building was granted many awards for excellenc...

edge1

The Edge | Amsterdam

During the completion of this prestigious project in 2014, The Edge...